-
The Iowa Treated Water Pipeline Project: Providing Growth with Safe, Clean Water
11/09/2021 In Installation ServicesShallow aquifers prone to contamination, compliance with federal drinking water standards, and insufficient resources to replace aging infrastructure. These are some of the water issues that launched the creation of the Lewis & Clark Regional Water System and the construction of the Iowa Treated Water Pipeline – Segment 3.
Latest Posts
- How is Ductile Iron Resilient to Disruptive Events? Part II – DI Pipe & Wildfires 04/22/2025 In Products Resiliency Technical
- Crossing the Saugus River with Ductile Iron Pipe - When, Why, Who, and How 04/15/2025 In Installation Products Technical
- Why Would High Temperatures Affect Piping Material Selection? 03/25/2025 In Products Technical
- Young Water Professionals - A Guide to Success 02/14/2025 In Career Resources